Skip to main content
Xuntao logo

Quality

Checks at every stage of production

Parts are checked when material arrives, as they are molded, once they are assembled and before they ship. Test equipment on site supports those checks.

Four inspection points

Each stage of the process has its own check, so a problem is caught where it starts.

  1. 01

    Incoming material

    Material is checked when it arrives, before it is released to the injection workshop.

  2. 02

    Injection

    Molded parts are inspected as they come off the injection line.

  3. 03

    Assembly

    Assembled vents and mechanisms are checked, including their moving parts.

  4. 04

    Shipping

    Finished parts are checked and packed before dispatch.

Equipment for flammability, salt spray and air-vent testing

Test equipment supports the inspection points above, from material samples to finished air vents.

  • Flammability testing equipment

    Flammability test equipment

    A ventilated test cabinet used to check how interior material samples burn.

  • Salt spray testing equipment

    Salt spray test equipment

    Exposure equipment used to check surfaces and finishes against salt-laden moisture.

  • Air vent testing equipment

    Air-vent test equipment

    Bench equipment used to check how an air vent behaves in use.

Separate handling of nonconforming material

A designated area separates material awaiting disposition from the production flow.

Nonconforming material segregation

Questions about inspection for your project?

Tell us what your component needs to meet and we will discuss how it can be checked.